Mission area 03

Engineered to pass review. Modernized without disruption. Delivered ready to run.

Enterprise architecture, modernization, and systems engineering for national security headquarters: network, datacenter, and enclave designs, migrations to enterprise and cloud services, and infrastructure as code. Each is run as a project: sized and costed before it starts, and handed to the people who will run it with the records to prove it.

Talk to usCapability statement

What is at stake

Adopt before you buy. Buy before you build.

Headquarters IT organizations carry years of accumulated systems, each with its own owner, its own risk, and its own bill. The job is to modernize without disrupting the leaders and staffs who depend on those systems. Migrate to approved enterprise services where they fit. Buy where a product already does the job. Retire what no longer earns its cost. Build only what the mission needs.

Fielding a capability is not the same as operationalizing it. The morning after cutover, someone has to run it, monitor it, patch it, and recover it. We fix what that team will receive before the work starts, and the project is not finished until they can run it without us.

In practice

Where this has already been done.

Work we have delivered, with the customer's name left out, as our release policy requires.

References for this work go to contracting officers and teaming partners on request. Request past performance

Management tools262 to 140Led a modernization of a headquarters infrastructure and operations environment that rationalized 262 management tools to 140 with no loss of capability. What remained was integrated into one operating picture for operations staff and senior leaders.
To a commercial cloud4,000+ usersMigrated compartmented IT services for more than 4,000 defense and intelligence community users to a commercial cloud environment. Systems from multiple defense organizations were consolidated onto one secure web services platform.
A new enclaveAuthorizedDesigned and deployed a logically segregated enclave with full enterprise services (file, mail, collaboration, mobile, backup, and storage) for a sensitive legal mission. We obtained the initial authorization to operate at multiple classification levels and have kept it current since.
Three more results
DNS as codeLeading the move of an enterprise's DNS to infrastructure as code: records defined in version-controlled files, changes reviewed and automated, and environments kept in sync without hand edits.
Datacenter and access point modernizationLead network architects supporting a headquarters transport enterprise's datacenter infrastructure modernization and classified network access point upgrade. The enterprise has more than 7,000 managed network devices across four classification levels.
Identity and PKI modernizationLeading the identity management and public key infrastructure modernization for a sensitive legal mission's multi-classification environment, from architecture and design through engineering and deployment.

What we do

From the architecture to the retirement record.

ENGINEERING

Architect the environment

Network, datacenter, and enclave architecture for headquarters enterprises. Each design is taken from the site survey to a design package the customer's review board approves. The alternatives considered and their risks are written down.
ENGINEERING

Engineer the lifecycle

The full engineering lifecycle, inside the customer's governance. Requirements, engineering change proposals, design packages, engineering reviews, test and evaluation, transition packages, and decommissioning. Every project runs on a resourced schedule, a live log of risks and decisions, and formal reviews before the design is frozen and before anything goes live.
MODERNIZATION

Migrate to enterprise and cloud services

We move capabilities onto approved enterprise and cloud services. Compartmented services have moved to a commercial cloud, and overlapping management tools have been consolidated. Workloads are aligned to the customer's architecture standards and service catalog before they move. The result is less technical debt. The systems they replace are decommissioned as a project in its own right, with the records closed out.
MODERNIZATION

Automate the infrastructure

Infrastructure as code, with a review on each change before it is applied. DNS and network configurations are held in version control, with Ansible playbooks and templates in GitLab, plus monitoring and alerting. Disaster recovery has recovery objectives agreed with the customer and is exercised against them.
PROJECT DELIVERY

Size and cost it first

Estimates with the assumptions written down. We start with physical and virtual site surveys. Technical options come with their risks and dependencies named (long-lead procurements, power, space). The cost estimate is one the customer can plan against, and it is tracked against actuals in the monthly review.
PROJECT DELIVERY

Test, deploy, and hand off

Test plans cover acceptance, integration, regression, performance, and load. They are automated where the environment allows. The cutover is rehearsed, with an approved way back, and the handoff is one the operations team has accepted.

How we do it

Checked at three points before the customer signs.

Engineering projects run on the same operating rhythm as every GCyber program. The monthly program review compares our estimates with actuals, in hours and in dates. How we deliver

PHASE 1 Size and cost it Site surveys, options with their risks, an estimate the customer can plan against. PHASE 2 Plan and design it Requirements, design package, resourced schedule, live log of risks and decisions. PHASE 3 Build and test it Acceptance, integration, regression, performance, and load, before anything ships. PHASE 4 Deploy and cut over Rehearsed, with an approved way back and someone confirming it worked. PHASE 5 Run and close it Handed to the people who will run it, with the records, and the customer's signature. IS THE DESIGN RIGHT? IS THE PLAN TO DEPLOY IT SAFE? IS OPERATIONS READY TO OWN IT? PHASE 1 Size and cost it Site surveys, options with their risks, an estimate the customer can plan against. PHASE 2 Plan and design it Requirements, design package, resourced schedule, live log of risks and decisions. IS THE DESIGN RIGHT? PHASE 3 Build and test it Acceptance, integration, regression, performance, and load, before anything ships. IS THE PLAN TO DEPLOY IT SAFE? PHASE 4 Deploy and cut over Rehearsed, with an approved way back and someone confirming it worked. IS OPERATIONS READY TO OWN IT? PHASE 5 Run and close it Handed to the people who will run it, with the records, and the customer's signature.
Read this diagram as text
  1. Phase 1: Size and cost it. Site surveys, options with their risks, an estimate the customer can plan against.
  2. Phase 2: Plan and design it. Requirements, design package, resourced schedule, live log of risks and decisions. Decision before the next phase: is the design right?
  3. Phase 3: Build and test it. Acceptance, integration, regression, performance, and load, before anything ships. Decision before the next phase: is the plan to deploy it safe?
  4. Phase 4: Deploy and cut over. Rehearsed, with an approved way back and someone confirming it worked. Decision before the next phase: is operations ready to own it?
  5. Phase 5: Run and close it. Handed to the people who will run it, with the records, and the customer's signature.
COMPLIANCE INSIDE THE PIPELINE

Security and records in the workflow

RMF controls, STIG baselines, and records obligations go into the design at the first review. The authorization package is built alongside the engineering, so the deliverable arrives at review with its evidence.
TEST BEFORE YOU TRUST

Automated regression on every change

Boundary conditions and exception paths are tested deliberately. Automated suites run on every update, so regressions surface before users find them.
TRANSITION IS A DELIVERABLE

Nothing is done until operations can run it

We hand the documentation, the monitoring, the current diagrams, and the runbooks to the operations team, and the work is finished when the customer signs for it.
THREE DECISIONS

Design, deploy, operate

Is the design right (the design review)? Is the plan to deploy it safe (the deployment readiness review)? Is operations ready to own it (the operational readiness review)? We do not move past any of the three without evidence.

What a project delivers

Every engineering project leaves the same record behind.

The artifact set is fixed before the work starts, so the customer knows what they will own at the end and the next team can operate what we built.

When many projects run at once

A headquarters rarely runs one project at a time. Each of ours runs on a resourced schedule and a live log of risks and decisions. All of them report in the same monthly program review: deliverables and milestones on time or not, with the reason, and estimates against actuals. Schedulers and project controllers keep that picture current, so a customer with many projects under way can see where each one stands.

DefineRequirements document, risk register, work breakdown structure, RACI chart, communications plan, concept of operations.
Design and testSystem design document, test plan, test validation report, authorization package, a change request for every configuration change.
DeployDeployment plan, deployment validation report, operational readiness review, customer acceptance, service transition plan.
OperateAdministrator, configuration, and user guides; maintenance procedures; service support plan; backup and restore guide; continuity of operations plan; system fact sheet; executive summary.

Technologies we work in

The tools our people run today.

Listed by product so an evaluator can match us to a requirement and a candidate can find a role. Tools are named; the environments they run in are not.

Planning, test, and automation

  • Jira and Confluence
  • GitLab
  • JMeter
  • Automated acceptance and regression suites
  • Ansible
  • CloudFormation
  • OctoDNS
  • Infrastructure as code

Governance and records

  • eMASS
  • RMF and NIST SP 800-53
  • DISA STIGs

Platforms we engineer on

  • VMware
  • Kubernetes and Docker
  • Software-defined networking
  • AWS, including classified regions
  • Azure and Microsoft 365
  • Windows Server
  • Linux

The people who do this work

Engineers who hand off with the records.

Enterprise and network architects, systems and cloud engineers, project and test engineers, schedulers and project controllers, cleared to the level the program requires.

See open positions
Results You Can Trust.Tell us about your mission. We will tell you how we would run it.
Talk to usRequest past performance